Article Details
Id:18860
Product:finPOWER Connect Cloud
Type:FIX
Version:3.04.03.11
Opened:09/12/2021
Closed:09/12/2021
Released:04/02/2022
Job: J028009

The "Next Run" date for Scheduled Processes in finPOWER Connect Cloud was displaying incorrectly

The "Next Run" date column in the Scheduled Processes grid in finPOWER Connect Cloud was incorrectly displaying "01/01/1 00:00" instead of simply a blank table cell. This has been updated, and now the cell is blank if there is no applicable date.

This was usually the case when a Scheduled Process was configured to run immediately after another, meaning an accurate next run date could not be calculated.

In addition, the following enhancements have been made to the Scheduled Process grid:

  • Process Id column added
  • Process Type Icon column added
  • Scheduled Processes which run after another process now have their row highlighted in light blue.