Article Details
Id: | 22003 |
Product: | finPOWER Connect WS |
Type: | FIX |
Version: | 6.00.00 |
Opened: | 09/10/2024 |
Closed: | 15/01/2025 |
Released: | 17/04/2025 |
Job: | J034450 |
Scheduled Processes; Processes set to run daily (1440 minutes) were running every day, even if configured to only run on specific days of the week
Scheduled Processes which were configured to run with a frequency of 1440 minutes (daily), but only configured to run on specific days of the week were incorrectly running every day.
As an example, a task which runs Monday, Tuesday, Wednesday at 8am should be configured with a frequency of 1440 minutes, and the 3 days selected. Previously, this task would have run every day of the week.
This has been fixed, and now the Scheduled Task will only run on the days it is configured to run for.